SESVA_Logo_CircleSESVA_Logo_Stacked Circle_RGB

SES Volunteers Association of Western Australia Incorporated

“Together we can; Together we will”

Egg Drop

Outline:

Teams of between 3 and 5 participants are asked to make a structure from limited materials that will
prevent a raw egg from breaking when it is dropped by the facilitator from a height of 3 metres

This training resource is also available as a PDF.

View PDF

Resources:

People Required:
Participants: min=6 max=50

Timings:

Set-up: Up to 15 min
Running/De-brief: 15 min – 30 min
Pack-up: Up to 15 min

Pre-work

None

Hazards and Risks:

Specific Safety Notes: In addition to standard safety practices:

None

Key Learning Points:

Equipment and Layout:

oxes of plastic drinking straws to enable each team to be issued with approximately 50 straws  One roll of gaffer/duck/cloth tape  Raw eggs – allow 2 per team to accommodate breakages during construction  Step ladders or safe point from which to drop the egg  Sufficient clear floor/table space for teams to work on their device

Instructions:

1. Introduce this as a creative challenge with very few rules 2. State that the objective is that each team must design and build a structure that will prevent their egg from breaking when dropped from a height of 10 feet onto a solid floor (do not give any guidance as to the style of design, if questioned simply restate the objective) 3. The teams have just fifteen minutes in which to build their structure 4. Should more than one team succeed in protecting their egg, the winner will be determined by the fewest straws used. 5. Issue each team with approximately 50 drinking straws, one egg and a 1 meter length of gaffer/duck tape 6. Encourage the teams to work out of sight of one another 7. During the exercise walk around the teams giving time checks and monitoring progress 8. After 15 minutes call the teams together around the drop area 9. As the facilitator, you should drop the eggs but make sure you insist that the teams are satisfied with how you aim and make the drop or you may get the blame for a breakage.

Additional Notes:

Review and Conclusion:

Ask the teams what happened during the design and construction phase  Ask whether their design changed and why  Identify any positive individual contributions that you noticed during the task  Ask what each team (starting with the least successful) would do differently if they were to repeat the exercise  The infinite variety of solutions to this exercise it make it an excellent creative energiser, after which teams are likely to be more open to creative thinking